Thanks for this, Dave.
8440 is outstanding and is "in progress design", as per my open in
yesterday's meeting.
8443 went back "in progress implementation", because being able to see what
it does relies on being able to catch build failures early (i.e. fixes for
8440). I've changed it to "in design", as we need to decide what to do with
8440 (see above).
While 9209 is testable and doesn't touch templates, it does touch a js
file. For this reason, I will leave it until after the bootstrap 3
migration (which will affect js files as well as css and templates). I put
it back to "in progress implementation".
9087 is actually waiting for upstream, so I changed the status to
"WaitForUpstream".
As you stated correctly, 8511 and 9123 are waiting for the bootstrap 3
migration, so I set them back to "in progress implementation".
Thanks again.
Elliot
On 13 April 2016 at 20:51, Lerner, Dave <dave.lerner at windriver.com> wrote:
>
> The following have status of In Progress Review and the bugzilla # as not
> found in git log, and an email noting a push was found in pipermail.
>
> They are marked as 'Testable' if the changes didn't doesn't hit templates
> (or the author didn't say hold off).
>
> 9209 elliot The unique name validation for custom images happens
> Testable
>
> 9123 elliot Build history pages are missing the image customisation links
> Deferred testing - Touches 5 templates
>
> 9087 elliot Toaster hangs when you start a build specifying an invalid
> task
> Testable
>
> 9011 elliot Default sorting for recipes page not showing properly
> Deferred testing - hits tasks.html
>
> 8511 elliot Import layer page, "Add layer" button remains enabled when
> layer text input is empty
> Deferred testing - see Elliot's comment in
> https://lists.yoctoproject.org/pipermail/toaster/2016-April/004442.html
>
> 8247 michael The build form in the project page does not interact
> with adding / removing layers
> Deferred testing: I can't find the RR
>
> Searches by contributors in email to look for outstanding RRs that don't
> have status marked in review.
> 8443 elliot (bootstrap deferred) toaster: remove links from time field on
> failed builds
>
> 7005 sujith toaster-unique-projectname
> Being reworked? see
> https://lists.yoctoproject.org/pipermail/toaster/2016-March/004344.html
>
> 9071 sujith text encoding on project name
> Testable - unrelated rework or new defect found see
> https://lists.yoctoproject.org/pipermail/toaster/2016-March/004116.html
>
>
> These have status "In Progress Review" but have been pushed into
> toaster-next
> 9326 belen 'type the recipe you want to build' help says use semicolon
> but shows colon
> 9108 michael bitbake: toaster: PackagesTable show only installed packages
> 8695 michael No default sorting applied in recipes and machines layer
> details tables
>
> Did I miss any?
>
> Dave
> --
> _______________________________________________
> toaster mailing list
> toaster at yoctoproject.org
> https://lists.yoctoproject.org/listinfo/toaster
>
--
Elliot Smith
Software Engineer
Intel Open Source Technology Centre
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.yoctoproject.org/pipermail/toaster/attachments/20160414/a65810a4/attachment-0001.html>
More information about the toaster
mailing list